REDWatch Inc, Strawberry Hills NSW, made the following submission on the project:

Waterloo Metro Quarter State Significant Precinct Study

REDWatch opposes the SSP rezoning proposal, as in its view, the
supporting studies do not adequately deal with the matters raised in
the study requirements. As a result, REDWatch urges DPE to require
further work to be done on the SSP before the SSDA is assessed.

Our full submission is attached in PDF format